Circular
Learnings
UPSC CSE Preparation
Ethics Case Study
Question

Arvind Kulkarni is the Executive Engineer in charge of a major barrage on an inter-state river, whose water sharing between the upstream and downstream states is governed by a binding award of an Inter-State River Water Disputes Tribunal. The award requires his state, which lies upstream, to release a specified minimum quantity of water each month to the downstream state, particularly during the dry season.

This year, the monsoon has been deficient in the upstream state as well, leaving local reservoirs well below normal levels just as farmers enter a critical sowing window that depends on assured irrigation. Local farmers’ associations and the state irrigation department have urged Arvind to delay or reduce the mandated release, arguing that the upstream state’s own farmers should not bear the cost of a tribunal award framed in a wetter year, especially when their distress is equally genuine this season. At the same time, Arvind is aware that the downstream state’s capital city, whose drinking water supply substantially depends on this very release, is already facing an acute water shortage, with several localities receiving supply only once every few days.

Withholding or reducing the release would violate the binding tribunal award and could invite contempt proceedings and a serious inter-state dispute, while complying in full risks worsening an already difficult sowing season for farmers in Arvind’s own state.

Based on the above case study, answer the following:

a) What are the ethical dilemmas being faced by Arvind in implementing the tribunal’s award this season?

b) Would it be ethically justified for Arvind to reduce the release below the mandated quantity, given the genuine distress on both sides? Give reasons for your answer.

c) What course of action would you recommend Arvind take?

Model Answer

Subject Matter

Whether a binding inter-state water-sharing award can ethically be departed from when the state obligated to release water is itself facing genuine drought distress, and how an implementing officer should balance compliance against competing regional hardship.

Facts

  • A Tribunal award binds the upstream state to release a mandated minimum quantity of water monthly to the downstream state
  • Deficient monsoon in the upstream state has left reservoirs low just as farmers enter a critical sowing window
  • Local farmers and the state irrigation department urge reduced release, arguing the award was framed for a wetter year
  • The downstream capital city’s drinking water supply substantially depends on this release, and is already facing acute shortage
  • Non-compliance risks contempt proceedings and a serious inter-state dispute; full compliance risks worsening the sowing season upstream

Values/Principles Involved

  • Rule of law and institutional trust in adjudicated settlements
  • Trusteeship — a shared river held for all its dependent communities, not any one state’s possession
  • Equity between two simultaneously genuine claims
  • Federalism and cooperative governance over unilateral action

Stakeholders

  • Upstream farmers, facing a critical, time-sensitive sowing window with reduced water availability
  • Downstream urban residents, facing an acute drinking water shortage substantially tied to this release
  • The upstream state government and irrigation department, seeking to protect local agricultural interests
  • The downstream state, whose legal entitlement under the award is at stake
  • Arvind Kulkarni, as the officer responsible for actual implementation

(a) Ethical Dilemmas Faced by Arvind

  • Rule of Law vs Local Distress — implementing a legally binding award in full versus responding to the genuine, immediate hardship of farmers in his own state
  • Institutional Duty vs Political Pressure — his professional obligation to comply with the tribunal award against direct pressure from the state irrigation department and farmers’ associations to depart from it
  • Equity Between Two Genuine Claims — this is not a dilemma between a legitimate need and an illegitimate one, but between two simultaneously real hardships, which is precisely what makes it difficult
  • Individual Discretion vs Institutional Process — whether he has any legitimate room to adjust implementation unilaterally, or whether any change must be sought through the tribunal’s own review mechanism rather than at the barrage gate
  • Short-Term Relief vs Long-Term Institutional Trust — a unilateral reduction might ease this season’s local distress but risks damaging the credibility of tribunal awards as a mechanism for resolving future disputes

(b) Would Reducing the Release Be Ethically Justified? — Not Unilaterally, Though the Underlying Grievance Has Merit

  • A tribunal award is the outcome of a structured, evidence-based adjudication specifically designed to balance both states’ claims — unilaterally departing from it because this particular season is difficult substitutes one engineer’s or one state’s judgment for a legally settled determination, undermining the very mechanism that exists to prevent water disputes from being resolved through unilateral pressure
  • The claim that “the award was framed for a wetter year” may well have merit, but the remedy lies in seeking review or modification through the Tribunal, not in ad hoc non-compliance at the point of implementation — treating the river as a trust held jointly, rather than upstream property, means neither state gets to unilaterally revise the terms whenever a dry year makes compliance costly
  • Drinking water for the downstream capital carries a distinct ethical weight: where irrigation shortfall causes serious economic hardship, an acute urban drinking water shortage risks more immediate harm to basic subsistence needs — this asymmetry matters even though both hardships are genuine
  • This does not mean the upstream distress should be ignored — only that rigid enforcement without any parallel relief effort is as incomplete a response as unilateral non-compliance would be

(c) Recommended Course of Action

  1. Comply with the tribunal-mandated release, since Arvind’s position does not carry the legal authority to unilaterally modify a binding inter-state award, and doing so would set a precedent undermining the entire adjudicatory framework
  2. Formally document and escalate the upstream distress to the state government and, through it, to the Tribunal or the relevant River Water Authority, seeking an expedited review of the release schedule for this specific drought year, rather than resolving the tension informally at the barrage
  3. Recommend parallel drought-relief measures for upstream farmers — emergency irrigation support, crop insurance activation, or alternative water source access — so that compliance with the award is not the sole channel through which their hardship is addressed
  4. Maintain transparent communication with both state governments about reservoir levels and release calculations, ensuring neither side can later allege the implementation was arbitrary or opaque
  5. Support institutional channels for renegotiation going forward — recommending that future awards include a built-in drought-year adjustment clause, so that genuine scarcity years do not repeatedly force a choice between legal compliance and local hardship

Way Forward

A binding inter-state award exists precisely so that water sharing during scarcity is not decided by whichever state can exert more local pressure at the point of implementation. Arvind’s task is not to choose between two genuine hardships at the barrage gate, but to keep the award’s integrity intact while ensuring upstream distress is addressed through the same institutional channels that created the award in the first place. Federalism during scarcity depends on this: that a shared river remains a trust to be jointly governed, not a possession to be defended state by state, season by season.